Pre-Handover (PCI) Inspections
The inspection before keys, where the water items get chased first.
Read more →Independent inspectors covering Rockbank and the estates around it, with your report back inside a day.
One of our inspectors will call you back.
If it is urgent, email [email protected]
Fully licensed & accredited
Building & Plumbing Commission
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society Seven checks through a Rockbank build, each timed before the work disappears behind the next trade.
1 Bored piers After boring and cage placement, before concrete
2 Slab pre-pour The day before the pour, with steel and formwork open
3 Frame Once frame and trusses are up and the roof is on, before sarking
4 Lock-up (pre-plaster) After roof, cladding and external doors, before plaster
5 Fixing After mouldings, doors and joinery, before painting
6 Waterproofing After the membrane is applied and cured, before tiling
7 Pre-handover (PCI) About a week before practical completion
The inspection before keys, where the water items get chased first.
Read more →
Building and timber pest together, covering the conditions around the house as closely as the house.
Read more →
An established property assessed under AS 4349.1, with cracking measured rather than described.
Read more →
The likely cause of damage to your Rockbank home, set out for your insurer.
Read more →
A dated photographic record of your property before construction starts beside it.
Written to the VCAT expert evidence practice note once a matter goes to the tribunal.










Six steps between your enquiry and the follow up call.
Address, stage and the date you need. You get a fixed figure back immediately.
One figure for that inspection, with nothing added afterwards.
Access arranged with you or the supervisor and the Melton corridor inspector assigned.
Photographed and measured against your engineering and the relevant standard.
Numbered and with you inside a day, ready to forward on.
Call the inspector who attended if a finding needs explaining.
Burak was prompt, very thorough with his inspection and report and provided great detail for the clients and builder/supervisor.
Ty is great, fantastic work and happy to recommend him to anyone. Really picked up on a lot of defects and helped me.
Ty did a very detailed PCI report
Excellent Service from TY well done!
We inspect every estate in Rockbank 3335 and the surrounding suburbs of Aintree, Deanside, Thornhill Park, Fraser Rise, Plumpton and Melton South. Our local inspectors are on site in Rockbank most weeks, so travel never adds to the price.

Fitted, visible, and contributing nothing.

Not extended, and punctures left open.

Where the windows sit in a Melton corridor program.
Building new in Rockbank Estate housing on a fixed program, and the two stages where the structure is decided.Read more →
Buying in Rockbank New estate stock and older established properties, needing different inspections.Read more →
Growth and development One of the City of Melton's fastest changing areas, with estates still releasing land.Read more →
Permits, council and disputes Melton council, your registered surveyor, and where a Victorian dispute goes next.Read more →
Ground, slabs and movement The City of Melton sits on basalt, but your lot's classification comes from your own soil report.Read more →
Termite and pest risk Trees at the foundations, degraded sealant and moisture that never leaves.Read more →
What we actually find near Rockbank Forty one inspection dates across the estates around Rockbank, and where the findings cluster.Read more →
Wet areas and what gets left behind Debris in drains and holes in a shower base, all of it invisible a week later.Read more → Instant online pricing for Rockbank, or contact the booking team.
It depends which service, which stage, and the size of the home. The online quote returns a fixed figure against your address instead of a range.
Ordinarily two to four business days, with stage inspections fitted to whatever window your builder's program leaves.
Inside 24 hours of attendance, with stage reports often landing that evening.
Yes, regularly. The reviews on this page are all from Rockbank clients.
AS 4349.1 for pre-purchase, AS 4349.3 for timber pests, AS 2870 for slabs, AS 1684 for framing, AS 3740 for wet areas, together with the NCC and the Guide to Standards and Tolerances 2015.
Yes. Aintree, Deanside, Thornhill Park, Fraser Rise, Plumpton and Melton South all sit on the same run.
Frame and pre-handover at a minimum. Slab pre-pour next, because the vapour barrier and reinforcement problems we see in this corridor cannot be corrected once concrete is placed.
The defect report exists so that you and the builder have a shared list to work from. The Building and Plumbing Commission dispute service and VCAT need an expert witness report drawn to the VCAT practice note.
Yes, and on a frame or slab inspection it is worth doing, because everything is still open to view.
Structural items cite the engineering drawing and finish items cite a tolerance, so the discussion moves onto a document.
Yes. A reinspection marks off each original item and gives you a second dated record.
The inspector who attended, with their mobile number printed on it.