Booking stage inspections around Rockbank
Where the windows sit in a Melton corridor program.
In short: Trades follow closely here. These are the points before work disappears.
A fixed program, narrow gaps
The space between a stage finishing and the next covering it is usually days.
Slab pre-pour
Barrier, bars and formwork. All permanent once concrete arrives.
Frame
Bracing tension, anchors and truss bearing, checked against the engineering.
Lock-up
Cut bracing, damaged studs and roof tile condition before plaster.
Waterproofing
Screed, drains and holes, before the tiler.
Pre-handover
A week out, so the list reaches the builder before you sign.
Written by the Owner Inspections team from inspections carried out in Rockbank. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.