The inspection before you take keys, written as a numbered list while the builder still carries the cost of fixing it.
A pre-handover inspection is assessed against your contract and selections, the Guide to Standards and Tolerances 2015, the National Construction Code and ABCB Housing Provisions, AS 3740 for wet areas and AS 3700 for masonry.
0 checkpoints across 0 areas on a standard Rockbank pre-handover (PCI) inspection. Anything locked, sealed or covered by stored goods on the day is recorded as not inspected. We do not pass work we could not reach.
From handover inspections in neighbouring suburbs, each caption naming where.








New Construction Stage Inspections Seven checks through a Rockbank build, each timed before the work disappears behind the next trade.
Pre-Purchase Building Inspections An established property assessed under AS 4349.1, with cracking measured rather than described.
Building and Pest Inspections Building and timber pest together, covering the conditions around the house as closely as the house.
Defect Investigation Reports Comparing the failure with what the engineering called for, so the discussion turns on the drawing. Instant online pricing, or talk to the booking team on 1300 471 805.
A water stop sits beneath the shower screen and stops water tracking out under it. Left out, the shower leaks into the adjoining floor and you will not see it until the flooring lifts.
About a week before practical completion, so the list reaches your builder before you are asked to sign anything.
Circuits are not made live, plumbing is not pressure tested, heating and cooling are not commissioned, appliances and garage door safety systems are not tested, and concealed or obstructed areas are not inspected.