A pre-handover checklist near Rockbank
Water items first, because that is where this corridor fails.
In short: Overflows, flashings and water stops are what handover produces here.
Book ahead of the date
A week gives us time to attend and you time to send the list.
The box gutter overflow
It has to be compliant and able to discharge. We found one that was neither.
Flashing position
Behind the cladding, not on its face. On the face it directs water inward.
Water stops
Beneath the shower screen, or water tracks out under it.
Roof penetrations
Flashed, not sealed over.
Then the finishes
Joints caulked, tiles intact, surfaces made good.
Written by the Owner Inspections team from inspections carried out in Rockbank. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.


